Your dog is in safe hands
  0 items

Recall Line/ Long Lead

The COA Recall Line allows a dog to run free yet remain under control if walking in a public place. It is an ideal tool for early recall training without the owner or trainer having to worry that the dog is loose. Additionally, it is excellent for controlled socialisation of puppies and for dogs with aggression issues. Available in two different lengths; 5m and 10m. Free training guide, featuring tips and easy to follow instructions included in every pack.

  • The Company of Animals Recall Line is a must have for recall training; it allows the dog to be seemingly free and yet remain under control.
  • Perfect training tool for outings in a public place.
  • The soft padded webbing makes the recall line comfortable to hold.
  • Available in two different lengths; 5m and 10m.
  • An essential tool for recall training and ideal to allow safe and controlled socialization for puppies, young dogs, and aggressive dogs.

 

Price range: £11.00 through £14.00

SKU: coarl Categories: ,
Our Brands
shop links
© 2026 WAGS Oadby Ltd | Company number 12581431
menu-circlecross-circle
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram